Ore Crushing and Screening Project
Ore Crushing
Ore Crushing and Screening Project
Project Location:Yantai, Shandong
Related Products:Test4、Hydraulic Breaker
Primary rock breaking and size control were completed in mining conditions, improving downstream screening and material utilization.
Project Details
For temporary processing at mining slopes and work faces, the excavator-mounted attachment completed primary breaking and reduced the burden on downstream transport and screening equipment.
Project Results
| Result | Description |
|---|---|
| Size Control | Crushed material became more suitable for downstream screening. |
| Equipment Coordination | Reduced waiting time for fixed crushing equipment. |
